AMC – Assembly
Supply fabrication, surface treatment and transportation of 32 triangulated tubular trusses 40m L x 9 H x 6.5 W and associated steelwork which form part of the mobile assembly hall.
Other works included the assembly and transportation of 5000 tonnes of 800mm & 1000mm steel piles all at 46m in length and the fabrication of the 200T capacity portal crane, the main box girders being 2.4m wide x 5m high and 65m long weighing 160 tonnes each.
Major capital works investment project was undertaken consisting of the construction of a CNC pipe profiling machine to allow for the profiling of pipe ends and the creation of a high wide load corridor of 10x10m clear way to enable transportation to the site.
Work proceeded on 5 trusses at a time in PIC’s workshop No. 2 with all work completed safely on time and within budget.