Pluto LNG Emission Chimneys
Works involved the fabrication, surface treatment, refractory lining and load out of the 3 Gas Turbine emission chimneys. Sections completed where up to 7 meters in diameter and weighing in excess of 200 tonnes each.
Works involved the fabrication, surface treatment, refractory lining and load out of the 3 Gas Turbine emission chimneys. Sections completed where up to 7 meters in diameter and weighing in excess of 200 tonnes each.